Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the simple-responsive-slider domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /afs/usgs.gov/www/tst/htdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tempera domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /afs/usgs.gov/www/tst/htdocs/wp-includes/functions.php on line 6121
Events for December 2025 – USGS Technical Support Teams
Loading Events

« All Events

  • This event has passed.

2017 NWIS Continuity of Operations Test deadline

March 31, 2017

It is time again to schedule the NWIS security tasks for 2017. This year we need for you to review your NWIS server inventory and perform your COO tests.  Even through the NWIS-TS system is rolling out this year, replacing the NWIS ADAPS, the NWIS COO testing is important as ever. There is still the need to have coverage this year for contingencies for the all NWIS systems (ADAPS, Water Quality, Ground Water Inventory, and Water Use). 

If you have any questions or issues, please communicate with the NWIS Security Team: gs-w NWIS Security.

Details

Date:
March 31, 2017
Website:
http://nwis.usgs.gov/SECURITY/COO/CooTestInstructions.htm